Framed windows

The construction of Margaret Chase Smith School's addition continues to go well.  You can see progress being made every day.  Soon the exterior of the building will be enclosed the construction crews continue their work on the interior of the addition.  Pictured above is photo of the frames that have been built for the windows to be installed.  In the pictures below you can see the frames and studs for the exterior walls, and the last picture is a section's floor that has been poured.  It will not be long before PC Construction will be ready to start renovating the existing part of Margaret Chase Smith School.